News

9 Nov 2018

JPJ Audio at the WWE Super Show-Down

WWE, in partnership with TEG Dainty, returned to Australia with WWE Super Show-Down, an historic event that took place at the Melbourne Cricket Ground (MCG) and featured the largest collection of WWE Superstars and Legends ever to appear in the country.

JPJ Audio provided the audio for this prestigious event including a Clair Global Cohesion 12 Line Array PA that was located in the centre of the MCG firing outwards. Also supplied were a flown monitor system inside the ring, all the RF requirements, consoles, patch equipment and of course, an excellent crew.

“The design was based on twelve boxes of CO-12 per hang with two hangs at each corner of the stage,” said Alex McCormack, JPJ’s Crew Chief. “However, despite what appears to be a small amount of boxes, the coverage was great all the way to the very back of the grandstands.”

For the FOH mix there was a DiGiCo SD10 along with a fully redundant SD9. Monitors also used an SD10, added in case there was a live band thrown in at the last minute. Our experience with WWE is you need to be prepared for last minute additions based on the direction of the live event, this set up allowed us to deal with any such situation.

The entrance stage at southern end of the ground featured a ramp down to the ring for the wrestler and host entries. The stage and ramp housed monitors and wedges but no control gear as they were covered by the monitor system.

A full, cutting edge Shure Axient RF system was positioned at front of house with wireless workbench monitored by the FOH engineer and JPJ RF tech monitoring the spectrum. Despite the MCG having significant challenges with multiple TV channels clashing in the middle of the stadium, it ran very smoothly.

“The channel count was kept relatively low compared to what we were prepared for,” added Alex.

WWE’s Lance Vardis did FOH and Clair Global’s Daniel Laveglia executed all of the prep work in consultation with JPJ’s Mats Frankl to ensure a successful event. This was no mean feat as the event was nothing like a typical WWE arena setup.

Despite being held in Melbourne, there was not a single drop of rain during the six days our gear and crew were exposed to the elements!

www.jpjaudio.com.au

Subscribe

Published monthly since 1991, our famous AV industry magazine is free for download or pay for print. Subscribers also receive CX News, our free weekly email with the latest industry news and jobs.